CFD Online Logo CFD Online URL
www.cfd-online.com
[Sponsors]
Home > Forums > Software User Forums > ANSYS > FLUENT

number of iterations per time step

Register Blogs Community New Posts Updated Threads Search

Like Tree4Likes
  • 4 Post By aeroAngel

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old   August 29, 2008, 05:48
Default number of iterations per time step
  #1
chouki
Guest
 
Posts: n/a
Hello, What is the minimal number of iterations per time step in an unsteady simulation that we can consider enough sufficient to capture the temporal evolution of the flow? Regards, Chouki
  Reply With Quote

Old   August 13, 2013, 01:11
Default
  #2
New Member
 
aeroAngel's Avatar
 
Fateme Sh
Join Date: Jul 2013
Location: Tehran
Posts: 8
Rep Power: 13
aeroAngel is on a distinguished road
according to the http://www.sharcnet.ca/Software/Flue...me_inputs.html its 20.


  1. Solution parameters for the implicit transient formulations are as follows:
    • Max Iterations/Time Step: When ANSYS FLUENT solves the time-dependent equations using the implicit formulation, multiple iterations may be necessary at each time step. This parameter sets a maximum for the number of iterations per time step. If the convergence criteria are met before this number of iterations is performed, the solution will advance to the next time step.
    • Time Step Size: The time step size is the magnitude of . Since the ANSYS FLUENT formulation is fully implicit, there is no stability criterion that needs to be met in determining . However, to model transient phenomena properly, it is necessary to set at least one order of magnitude smaller than the smallest time constant in the system being modeled. A good way to judge the choice of is to observe the number of iterations ANSYS FLUENT needs to converge at each time step. The ideal number of iterations per time step is 5–10. If ANSYS FLUENT needs substantially more, the time step is too large. If ANSYS FLUENT needs only a few iterations per time step, should be increased. Frequently a time-dependent problem has a very fast “startup” transient that decays rapidly. Therefore, it is often wise to choose a conservatively small for the first 5–10 time steps. may then be gradually increased as the calculation proceeds.
      For time-periodic calculations, you should choose the time step based on the time scale of the periodicity. For a rotor/stator model, for example, you might want 20 time steps between each blade passing. For vortex shedding, you might want 20 steps per period.
      To verify that your choice for was proper after the calculation is complete, you can plot contours of the Courant number within the domain. To do so, select Velocity... and Cell Courant Number from the Contours of drop-down lists in the Contours dialog box. For a stable, efficient calculation, the Courant number should not exceed a value of 20–40 in most sensitive transient regions of the domain.
    • Time Stepping Method: By default, the size of the time step is fixed (as indicated by the selection of Fixed).
      To have ANSYS FLUENT modify the size of the time step as the calculation proceeds, select Adaptive and click the Settings... button to specify the parameters in the Adaptive Time Step Settings dialog box. See Adaptive Time Stepping for details.
      For transient volume of fluid (VOF) calculations that use the explicit scheme of VOF, you can select the Variable time stepping method. The parameters set through the Parameters... button are in many ways the same as for the adaptive time stepping method, with the exception of specifying a global Courant number (see Variable Time Stepping).
      Note that with the Adaptive or Variable time stepping method, the value you specify for the Time Step Size will be the initial size of the time step. As the calculation proceeds, the Time Step Size shown in the Run Calculation task page will be the size of the current time step.
  2. Specify the desired Number of Time Steps in the Run Calculation task page and click Calculate.
    As it calculates a solution, ANSYS FLUENT will print the current time at the end of each time step.
aeroAngel is offline   Reply With Quote

Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Time step size and max iterations per time step pUl| FLUENT 31 October 23, 2020 23:50
VOF - iterations per time step anni FLUENT 4 November 1, 2014 05:28
SELECTING TIME STEP SIZE, NUMBER OF TIME STEP NITUL KALITA FLUENT 2 November 22, 2012 09:28
udf - iteration number within one time step?! Mira FLUENT 1 January 23, 2008 04:16
Time Step for Sub-Iterations Arun FLUENT 2 May 18, 2004 06:13


All times are GMT -4. The time now is 08:41.