|
[Sponsors] |
August 28, 2015, 13:04 |
Les transient simulation (loading)
|
#1 |
Senior Member
|
Dear colleagues;
I am trying to load transient results from a our LES code. At this stage I only have 141 files of 65 MB ( each file). Every time I try to load them it says that more memory is needed (or something like this). So I was wondering about the computational resources for LES simulation and TECPLOT. The computer only have 4 GB RAM. I thought it was more than enough..!!! Last edited by juliom; August 28, 2015 at 21:24. |
|
August 28, 2015, 19:29 |
|
#2 |
Senior Member
Scott Rumage
Join Date: May 2009
Location: Seattle, WA
Posts: 152
Rep Power: 17 |
Julio,
I have a couple questions – is the total size of all your files 65 MB, or is each file 65 MB (and so 141 x 65 = 9165 MB or 9.165 GB)? What version of Tecplot are you using? You can down load the latest version of 360 EX here: http://www.tecplot.com/my/product-releases/ . BTW … the fact that your solution is an LES type should not be an issue. Scott |
|
August 28, 2015, 21:23 |
|
#3 |
Senior Member
|
Dear Mr. Scott;
I really appreciate your comment. thank you very much. When I sayd LES, I just wanted to refer to big data that need to be load. LES usually have thousand or even million of files, depending on the physics. The size o each file is 65 MB, but I think that the memory required to load all the data is not 9.1 GB. Otherwise, loading large files, as it is usually in LES and DNS, may not be possible. What do you think? I am using the standard approach; I changed the extension to .plt. Then I loaded multiple file and that's it.... How do you usually load big transient data sets? Thanks!!! Julio |
|
August 31, 2015, 15:02 |
|
#4 |
Senior Member
Scott Rumage
Join Date: May 2009
Location: Seattle, WA
Posts: 152
Rep Power: 17 |
To load a big transient data set, I believe you will need to have enough RAM to hold entire transient solution (as Tecplot 360 assumes you will want to investigate the entire solution during one post-processing session).
Since that is not your situation, one alternative to create an animation of the date would be to create a Tecplot macro that: 1. opens Tecplot 360 2. loads a time step 3. creates the image or view desired via a saved “style sheet” 4. exports that image to an uniquely named image file, e.g. time_step_01.jpg 5. closes Tecplot 360 (or discards the data before loading the next time step) and repeat Then the next step would be to stitch the *.jpg images together to create an animation via a non-Tecplot image editing program. I do not have a recommendation for this editing/stitching program. Scott |
|
August 31, 2015, 15:28 |
|
#5 |
Senior Member
|
Dear Mr. Scott I really appreciate your comments, thank you very much.
Are these macro written directly in Tecplot? I assume that this is in C++ I was wondering about other research groups who work with huge data sets!!! I will read about the macro you mention!!! Thanks! |
|
August 31, 2015, 15:37 |
|
#6 |
Senior Member
Scott Rumage
Join Date: May 2009
Location: Seattle, WA
Posts: 152
Rep Power: 17 |
The macro is written directly in Tecplot. Here a couple links to the Tecplot web-site to help you with this:
http://www.tecplot.com/blog/2014/09/24/360video-quick-macro-panel/ http://www.tecplot.com/blog/2013/09/24/tecplot-tip-file-types-and-an-example-macro/ Scott |
|
August 31, 2015, 15:45 |
|
#7 |
Senior Member
|
Thank you very much Mr. Scott!!
I appreciate it! |
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
How to get better convergence in transient simulation | sjtusyc | CFX | 36 | April 29, 2013 00:19 |
outlet profiles of LES simulation as transient inlet b.c. for LES of a bend pipe | Henny | FLUENT | 0 | March 28, 2013 05:02 |
Steady state simulation with transient partilcle tracking | mali28 | FLUENT | 2 | February 7, 2013 15:25 |
how to identify transient simulation converged | littlelz | CFX | 5 | January 27, 2009 19:13 |
transient simulation | Tad | CFX | 1 | November 30, 2003 17:25 |