CFD Online Logo CFD Online URL
www.cfd-online.com
[Sponsors]
Home > Forums > General Forums > Structural Mechanics

Unable to bond rebar and concrete

Register Blogs Community New Posts Updated Threads Search

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old   January 13, 2018, 11:26
Default Unable to bond rebar and concrete
  #1
New Member
 
Rakshith Krishna
Join Date: Jan 2018
Posts: 1
Rep Power: 0
rak18 is on a distinguished road
I have modeled an RC beam in ansys and applied a load of 15kN on top face.
I used to get a solver pivot error until i changed to solver from program controlled to iterative. It gave me result this way.

But the problem is the loads acting only on the concrete block neglecting the rebars as seen in the image, what am I doing wrong?

Image :



https://i.imgur.com/OqeQntI.png
rak18 is offline   Reply With Quote

Old   February 15, 2018, 03:24
Default
  #2
siw
Senior Member
 
Stuart
Join Date: Jul 2009
Location: Portsmouth, England
Posts: 742
Rep Power: 26
siw will become famous soon enough
There are no connections in the outline tree so the concrete solid body and rebar line bodies are not connected together. Furthermore, is the force only scoped to the top face of the solid body?
siw is offline   Reply With Quote

Old   March 27, 2018, 03:29
Default
  #3
Member
 
Join Date: Mar 2018
Posts: 56
Rep Power: 8
Mrt23 is on a distinguished road
In abaqus it's named embedded element.
I don't know how it is in ansys.
Mrt23 is offline   Reply With Quote

Reply

Tags
ansys workbench 18, bonded, rc beam


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 05:16.