[Sponsors] |
November 24, 2005, 08:45 |
cell size
|
#1 |
Guest
Posts: n/a
|
hi when i am making trimmed mesh, what is maximum and minimum cell size i have to give. for the same problem i am getting converged solution with some value of max and min cell size, but if it changes i am not getting convergence. what is the optimal cell size recommended in star-cd. Thanking you with reg Baskar
|
|
November 24, 2005, 09:41 |
Re: cell size
|
#2 |
Guest
Posts: n/a
|
how long is a piece of string?
|
|
November 26, 2005, 00:58 |
Re: cell size
|
#3 |
Guest
Posts: n/a
|
Baskar, you have just hit upon one of the problems of CFD. Just because something may work, doesn't mean it is correct. There are a couple of best practices you might want to check out.
Basically, when building a mesh for a problem a mesh sensitivity study is done. The mesh size is increased until the answer doesn't change, then go back to the smaller mesh size that gives the same answer. Different kinds of problems have different mesh size requirements. Tom |
|
January 17, 2006, 13:04 |
Re: cell size
|
#4 |
Guest
Posts: n/a
|
Tom, you are quite right. Can you please suggest me the steps to carry out mesh sensitivity study for a problem? What parameters i need to focus for one-to-one comparison.
Actually i want to carry out a comparative study of cell-size effect as well as cells-type ( Hexa, Pyramid, tetra etc. ) effect for a fixed problem. Thanks in advance Sidd |
|
January 18, 2006, 14:34 |
Re: cell size
|
#5 |
Guest
Posts: n/a
|
Siddharth, the ERCOFTAC best practices recommends that for each class of problem a grid dependency study be performed. They recommend using three grids that are signficantly different in grid size, where ideally you double the grid twice in each direction and then apply the Richardson extrapolation (P.J. Roache(1997), "Quantification of Uncertainty in Computational Fluid Dynamics," Annual Review of Fluid Mech., Vol.29, pp 123-160).
What is interesting is that sometimes it is not the entire grid that is important. I just finished a study where with one grid size it took 5000 iterations for the residulas to converge to E-04. I did a grid refinement on just one section of the mesh and the problem converged to residuals of E-06 in 1500 iterations and agrred with the test data. I hope this helped. Tom |
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Limit on maximum cell size to minimum cell size ratio | albcem | OpenFOAM Running, Solving & CFD | 2 | October 17, 2011 13:00 |
the 1st cell size from Y+ | ken | Main CFD Forum | 0 | December 11, 2005 09:56 |
cell size | Sam | FLUENT | 2 | March 11, 2005 04:33 |
cell size | solomon | Main CFD Forum | 0 | May 17, 2003 14:52 |
Cell size | Roued | Siemens | 1 | November 22, 2001 06:13 |